【24h】

Use of modeling in repository licensing

机译:在存储库许可中使用建模

获取原文
获取原文并翻译 | 示例

摘要

A review of the regulatory history of the Nuclear Regulatory Commission (NRC) regulations applicable to the licensing of a geologic repositiry, as well as a review of NRC administrative (licensing) decisions and federal case law, support the NRC's sue of simplified models, in appropriate circumstances, which privide well-documented and reasonably conservative beounding assumptions, together with the use of expert judegement, natural analogues, and other aids to supplement available information, inreaching its reasonable assurance determination whether the public yhealth and safety will be adequately protected if the Yucca Mountain, Nevada site should be licensed for development as a geologic repository.
机译:对适用于地质处置库许可的核监管委员会(NRC)法规的监管历史进行审查,以及对NRC行政(许可)决定和联邦判例法进行审查,均支持NRC起诉简化模型。适当的情况下,这些情况应采用有据可查且合理的保守性假设,并使用专家判断,自然类似物和其他辅助手段来补充可用的信息,从而对其合理的确定性做出判断,以确保在以下情况下是否能够充分保护公众的健康和安全:内华达州尤卡山(Yucca Mountain)站点应获得许可,可作为地质资料库进行开发。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号