首页> 外文会议>Second Asian Particle Accelerator Conference Sep 17-21, 2001 Beijing, China >BEPC BEAM INSTRUMENTATION SYSTEM AND ITS UPGRADE FOR BEPC-Ⅱ
【24h】

BEPC BEAM INSTRUMENTATION SYSTEM AND ITS UPGRADE FOR BEPC-Ⅱ

机译:BEPC-BEBE-BEAM光束仪表系统及其升级

获取原文
获取原文并翻译 | 示例

摘要

The Beijing Electron Positron Collider (BEPC) has been successfully operated for many years since 1989. Now BEPC is proposed to upgrade to BEPC-Ⅱ. The beam instrumentation system of the BEPC storage ring includes many subsystems such as BPMs, tune measurement, current monitor, synchrotron radiation monitor, etc. This paper will describe the present operation performance of the beam instrumentation system of the BEPC storage ring and its upgrade plan for BEPC-Ⅱ.
机译:自1989年以来,北京电子正对撞机(BEPC)已成功运行了多年。现在,BEPC被提议升级为BEPC-Ⅱ。 BEPC存储环的光束仪表系统包括许多子系统,例如BPM,调谐测量,电流监控器,同步加速器辐射监控器等。本文将介绍BEPC存储环的光束仪表系统的当前运行性能及其升级计划。用于BEPC-Ⅱ。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号