首页> 外文会议>Reliable software technologies-Ada-Europe 2009 >Combining EDF and FP Scheduling: Analysis and Implementation in Ada 2005
【24h】

Combining EDF and FP Scheduling: Analysis and Implementation in Ada 2005

机译:将EDF和FP计划相结合:Ada 2005中的分析和实现

获取原文
获取原文并翻译 | 示例

摘要

Earliest Deadline First (EDF) and Fixed Priority (FP) scheduling represent the two main dispatching policies within the research domain of real-time systems engineering. Both dispatching policies are now supported by Ada. In this paper the two approaches are combined to maximize the advantages of both schemes. From EDF comes efficiency, from FP predictability. A system model is presented in which a relatively small number of high-integrity tasks are scheduled by FP, with the rest of the tasks being handled via an EDF domain of lower priority. Two aspects of integration are covered in this paper. Firstly, Response-Time Analysis (for FP) and Processor-Demand Analysis (for EDF) are brought together to provide a single analysis framework. Secondly, the programming of systems which combine FP and EDF is addressed within the facilities provided by Ada 2005. Both partitioned and dynamic schemes are covered.
机译:最早的截止日期优先(EDF)和固定优先级(FP)调度表示实时系统工程研究领域内的两个主要调度策略。两种调度策略现在都由Ada支持。在本文中,将两种方法结合起来以最大化两种方案的优势。 EDF来自效率,FP来自可预测性。提出了一种系统模型,其中FP计划了相对少量的高完整性任务,而其余任务则通过优先级较低的EDF域进行处理。本文讨论了集成的两个方面。首先,将响应时间分析(针对FP)和处理器需求分析(针对EDF)结合在一起,以提供一个单一的分析框架。其次,在Ada 2005提供的功能中解决了将FP和EDF结合在一起的系统的编程问题。涵盖了分区方案和动态方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号