首页> 外文会议>(Re)Claiming the Underground Space >Implementation of monitoring strategy Hermes at the Green Heart Tunnel
【24h】

Implementation of monitoring strategy Hermes at the Green Heart Tunnel

机译:在“绿心隧道”中实施爱马仕监测策略

获取原文
获取原文并翻译 | 示例

摘要

This paper deals with the role of the client in a design and construct contract of a shield driven tunnel in relation to surface settlements and describes the implementation of the monitoring strategy HerMes (tHE Rational Monitoring and Evaluation System, a Delfts Cluster initiative) at the Green Heart Tunnel. This strategy presents a systematic approach, which incorporates validated measured data in the decision process and takes uncertainties regarding the behavior of the soil and the design models of the contractor into account. The implementation of the monitoring strategy and the related system for settling control gives the client an important tool to perform external quality control and risk management.
机译:本文探讨了客户在与地面沉降有关的盾构隧道的设计和施工合同中的作用,并介绍了绿色环保组织监测策略HerMes(合理监测和评估系统,代尔夫特集群倡议)的实施心隧道。该策略提出了一种系统的方法,该方法将经过验证的测量数据纳入决策过程,并考虑到有关土壤行为和承包商设计模型的不确定性。监控策略的实施以及相关的沉降控制系统为客户提供了执行外部质量控制和风险管理的重要工具。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号