New realization of driving Shield Tunnel Boring machines in Thailand

机译:在泰国驾驶盾构隧道掘进机的新认识

获取原文
获取原文并翻译 | 示例

摘要

The first Subway Project in Thailand commenced in 1996 allowing the realization of driving large diameter tunnels through Bangkok's very sensitive subsoil which consists of fine alluvial sediments which experience ongoing settlements caused by uncontrolled dewatering of the deeper fine sand layers. Touching on some details needed to fulfill the 120 years design life requirement the tunnelling achieved with two different designs of Earth Pressure Balanced Tunnel Boring Machines used within this one Project is described.
机译:泰国的第一个地铁项目始于1996年,它允许通过曼谷非常敏感的底土驱动大直径隧道,该底土由精细的冲积沉积物组成,这些沉积物由于较深的细砂层的失控脱水而不断沉降。阐述了满足120年设计寿命要求所需的一些细节,并描述了在该项目中使用的两种不同设计的土压平衡隧道掘进机实现的掘进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号