首页> 外文会议>Rapid Excavation and Tunneling Conference 2015 proceedings >CONSTRUCTION CHALLENGES OF THE CENTRAL SUBWAY’S TBM LAUNCH SHAFT AND STATION’S HEADWALLS
【24h】

CONSTRUCTION CHALLENGES OF THE CENTRAL SUBWAY’S TBM LAUNCH SHAFT AND STATION’S HEADWALLS

机译:中央地铁TBM发射井和车站前墙的施工挑战

获取原文
获取原文并翻译 | 示例

摘要

San Francisco’s growth requires additional transit solutions, which is why the SanrnFrancisco Municipal Transportation Agency (SFMTA) is building the Muni Metro TrnThird-Line Extension: Central Subway.rnThis $1.6 billion capital investment project features a 1.7-mile long, 21-ft. internalrndiameter twin bored tunnel. This paper describes the geotechnical conditions, urbanrnconstraints and the novel approaches adopted for the TBM Launch Shaft and the stations’rnheadwalls that the TBMs mined through. In particular, it will emphasize the specificitiesrnof building a slurry wall with 16-ft. headroom below an existing highway in service.
机译:旧金山的增长需要更多的公交解决方案,这就是为什么桑弗朗西斯科市政运输局(SFMTA)正在建设Muni地铁三号线扩建:中央地铁。这个耗资16亿美元的资本投资项目,长1.7英里,高21英尺。内径双孔隧道。本文介绍了TBM发射井和TBM所穿过的车站的顶壁的岩土条件,城市约束和新颖的方法。特别要强调的是建造16英尺高的泥浆墙的特性。在使用中的现有高速公路下方的净空。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号