PRELIMINARY DESIGN OF TUNNELS FOR THE LOWER NORTHWEST INTERCEPTOR, SACRAMENTO, CALIFORNIA, USA

机译:美国西北部萨科曼多的下西北拦截器隧道的初步设计

获取原文

摘要

The Sacramento Regional County Sanitation District (SRCSD) has undertaken an interceptor expansion program to meet future wastewater needs associated with projected growth over the next 20 years. The Lower Northwest Interceptor (LNWI) will include over 17 miles (27 kilometers) of pipeline including 14 miles (23 kilometers) of dual force main ranging in size from 54- to 60-inch (137- to 152-centimeter) diameter and 3 miles (5 kilometers) of 120-inch (305-centimeter) diameter gravity pipeline. The estimated capital cost for the program is $331 million, with approximately $236 million in construction cost (as of November 2002). The project includes 4,700 feet (1,433 meters) of tunnel including 2 crossings of the Sacramento River and one crossing of the Barge Canal, and 11 other smaller tunnel crossings beneath various creeks, sloughs, highways, and railroads. Preliminary design of the tunnels for the LNWI are discussed in this paper. The overall purpose of the preliminary design was to sufficiently define the project to allow planning level cost and schedule estimates to be performed. There have been changes to the project during final design including pipe sizes and configurations, tunnel and pipeline lengths and anticipated flows. This paper addresses only the preliminary design of the LNWI tunnels. Final design issues and changes made since completion of preliminary design are not addressed in this paper.
机译:萨克拉曼多地区县卫生区(SRCSD)实施了一项拦截器扩展计划,以满足与未来20年预计增长相关的未来废水需求。下部西北拦截器(LNWI)将包括超过17英里(27公里)的管道,包括14英里(23公里)的双力主力管,直径范围从54到60英寸(137到152厘米),直径3 120英寸(305厘米)直径的英里(5公里)重力管道。该计划的估计资本成本为3.31亿美元,其中建筑成本约为2.36亿美元(截至2002年11月)。该项目包括4,700英尺(1,433米)的隧道,其中包括萨克拉曼多河的2个过境点和驳船运河的1个过境点,以及各种小溪,泥沼,公路和铁路下面的其他11个较小的隧道。本文讨论了LNWI隧道的初步设计。初步设计的总体目的是充分定义项目,以允许执行计划级别的成本和进度估算。在最终设计期间,项目发生了变化,包括管道尺寸和配置,隧道和管道长度以及预期流量。本文仅涉及LNWI隧道的初步设计。本文不涉及最终设计问题和自初步设计完成以来所做的更改。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号