首页> 外文会议>Proceedings of the Third IASTED Asian Conference on Power and Energy Systems >REAL TIME SECURITY ASSESSMENT IN NATIONAL LOAD DESPATCH CENTRE, TENAGA NASIONAL BERHAD, MALAYSIA
【24h】

REAL TIME SECURITY ASSESSMENT IN NATIONAL LOAD DESPATCH CENTRE, TENAGA NASIONAL BERHAD, MALAYSIA

机译:马来西亚BERHAD国家电力国家负荷调度中心的实时安全评估

获取原文
获取原文并翻译 | 示例

摘要

In NLDC, the power system control centre of Tenaga Nasional Berhad, the use of on-line security assessment is still in the early stages. This paper undertakes a project implementation of a real time security assessment using VSAT and PSS/E. Real time data is obtained via NLDC's Westinghouse system in a format of different platform. The data is then converted to PTI's version 29 power flow data before it is modified to meet VSAT input data needs. The real time power flow data is then solved using PSS/E and saved. The real time data is then channeled to VSAT to conduct N-1, N-2 and Transfer Analysis of the TNB power system at an interval of 10 minute cycle. The evaluated real time scenario results are then extracted and custom made to be viewed by the system operator using Microsoft Excel. The entire security assessment process is accomplished using PSS/E, VSAT, Visual Basic programming, IPLAN and Microsoft Schedule Task.
机译:在Tenaga Nasional Berhad的电力系统控制中心NLDC中,在线安全评估的使用仍处于早期阶段。本文采用VSAT和PSS / E进行了实时安全评估的项目实施。实时数据是通过NLDC的Westinghouse系统以不同平台的格式获得的。然后,在修改数据以满足VSAT输入数据需求之前,将数据转换为PTI的版本29潮流数据。然后使用PSS / E求解实时潮流数据并保存。然后将实时数据传输到VSAT,以10分钟为一个周期进行N-1,N-2和TNB电力系统的传输分析。然后提取评估的实时方案结果,并进行自定义以供系统操作员使用Microsoft Excel查看。整个安全评估过程使用PSS / E,VSAT,Visual Basic编程,IPLAN和Microsoft Schedule Task完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号