EVALUATION OF OPTIMAL CAPACITY BENEFIT MARGIN ON TIE LINE BETWEEN CONTROL AREAS

机译:控制区域之间联络线上的最佳容量效益边际评估

获取原文
获取原文并翻译 | 示例

摘要

In order to maintain power supply reliability at a certain level, each power company has to keep its appropriate reserved capacity. When a generator outage or an unexpected large power demand occurs, power shortage can be avoided if power company has enough reserved capacity. Normally, this reserved capacity is not used except in case of emergency, and is often regarded as a surplus plant. To reduce the reserved capacity in each area, tie lines between control areas has a reserved margin to allow power exchange between them in case of unexpected events. For example, when a generator outage occurs in a control area and the power company cannot supply all power demand, the power will be supplied from its adjacent companies through the tie lines. Consequently, power shortage in this area will be avoided. This margin for the power exchange is called Capacity Benefit Margin (CBM). By reserving CBM on tie lines, reserved capacity in each control area can be reduced. In this study, a calculation method of an optimal CBM on tie lines is proposed. Then, numerical results for the optimal CBM and the reduced reserved capacity in each control area are shown for the test system.
机译:为了将电源可靠性维持在一定水平,每个电力公司必须保留其适当的预留容量。当发电机故障或意外的大功率需求发生时,如果电力公司有足够的备用容量,则可以避免电力短缺。通常,除非有紧急情况,否则不使用此保留的容量,通常将其视为剩余设备。为了减少每个区域中的预留容量,控制区域之间的联络线具有预留裕量,以便在发生意外事件时在它们之间进行功率交换。例如,当控制区域发生发电机停电而电力公司无法提供所有电力需求时,将通过连接线从其相邻公司​​提供电力。因此,将避免该区域的电力短缺。功率交换的裕度称为容量利益裕度(CBM)。通过在联络线上保留CBM,可以减少每个控制区域中的保留容量。在这项研究中,提出了一种在联络线上的最佳煤层气的计算方法。然后,显示了测试系统在每个控制区域中最佳CBM和减少的预留容量的数值结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号