The purpose of this paper is t o demonstrate the effectiveness of a partial cost analysis of computer system performance by simulation methods. The competing factors of cost of delay to Jobs and the mean system cost averaged over each job are considered in the analysis. Job characteristics are generated from a set of input means by Monte Carlo methods, and the processing of these jobs is simulated using a next-event type of model incorporating the scheduling logic and the gross hardware characteristics of the computer system.
rnThe results of such a partial cost analysis should be combined with other cost considerations to gain an overall cost picture. Rather than replacing accepted measures of system performance such as benchmark tests, the analysis may rely on these methods to provide some of the input information, such as the mean amount of central processor time requested. The characteristic feature of the type of analysis described here is the inclusion of the cost of delay to jobs asa relevant cost consideration.
本文的目的是演示通过仿真方法对计算机系统性能进行部分成本分析的有效性。分析中考虑了延迟作业成本和每个作业平均系统成本的竞争因素。作业特征是通过蒙特卡洛方法从一组输入手段生成的,并使用包含调度逻辑和计算机系统总体硬件特征的下一事件类型的模型来模拟这些作业的处理。 P> rn
这种局部成本分析的结果应与其他成本考虑因素结合起来,以获得总体成本状况。该分析可能不依赖于诸如基准测试之类的公认的系统性能度量标准,而是依靠这些方法来提供一些输入信息,例如请求的中央处理器时间的平均值。这里描述的这种分析的特征是将延迟工作的成本作为相关的成本考虑因素。 P>
机译:一项模拟研究:推迟家庭团聚使儿科灾难幸存者增加死亡率和住院费用
机译:延迟家庭统一?F儿科灾害幸存者提高了死亡率和住院医院费用:模拟研究
机译:空间扩展双稳态系统中具有延迟的前部动力学:计算机仿真
机译:整合基于活动的成本核算和计算机模拟,以调查泰国 - 马来西亚跨境:萨达海关房屋为例
机译:复杂系统的计算机模拟和理论研究:从复杂流体到受挫的磁体。
机译:医疗保健中的计算机应用。医院中的计算机系统。病历和质量保证:精神病院自动治疗计划的模拟研究
机译:网格连接集成社区能源系统。第二阶段:最终状态2报告。成本效益分析,运营成本和计算机模拟