首页> 外文会议>Proceedings of eleventh international symposium - management sciences and engineering >On Investment Control in the Pre-project Phase of the New Campus Construction
【24h】

On Investment Control in the Pre-project Phase of the New Campus Construction

机译:新校园建设前期阶段的投资控制

获取原文
获取原文并翻译 | 示例

摘要

The investment of the project phases including its pre-design phase, tender and bid phase which are under reasonable and effective control is very important. Do not put the pressure of the investment control on the construction phase, and try to ensure that every cost has been considered in the project preliminary budget before the construction, and to make it provide for a rainy day. A adopting the preliminary method of controlling the scale of construction analyzing the indicators of technique and economy demonstrating the design and electing and using vast materials and equipments, controlling of the bid document and contract term, as to reduce the total investment of the project.
机译:在合理有效控制下的项目阶段包括预设计阶段,招标和投标阶段的投资非常重要。不要在施工阶段施加投资控制的压力,而是要确保在施工前已将所有成本都考虑在项目的初步预算中,并要为雨天做好准备。采用控制工程规模的初步方法,分析技术和经济指标,论证设计和选择和使用大量材料和设备,控制招标文件和合同期限,以减少工程总投资。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号