To a project instrument engineer one of the most dreaded words one can hear is “Analyzer”. This wordrnbrings memories of a bad outcome on a previous project, for many. Somewhere a schedule was blown,rncosts were overrun, results were less than expected, someone displayed a great deal of displeasure at thernend result, or the engineer just wound up looking bad. It is desirable that someone with analyzerrnexperience would do all the analyzer installations and the good stuff would be left for the instrumentrnpeople. Most often the problems stem from lack of experience, lack of time, and lack of time to getrnexperience. Time is money and most managers want to limit the up-front hours in the estimate to keeprnthe cost down. This paper attempts to outline the steps necessary to have a successful analyzerrninstallation, identify the pitfalls, and to justify the front-end time needed to complete the projectrncorrectly.
机译:对于项目仪器工程师来说,最令人恐惧的单词之一就是“ Analyzer”。对于许多人来说,这使人们回想起先前项目的不良结果。在某个地方,进度表被打破了,成本超支了,结果比预期的要少,有人对结果很不满意,或者工程师看起来很糟糕。理想的是,具有分析仪经验的人员将完成所有分析仪的安装,并将好东西留给仪器人员。大多数情况下,这些问题是由于缺乏经验,缺乏时间和缺乏时间获得经验而引起的。时间就是金钱,大多数经理都希望限制估计的前期时间,以降低成本。本文试图概述成功安装分析仪所需的步骤,确定陷阱,并证明正确完成项目所需的前端时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号