首页> 外文会议>Analysis Division Symposium >PITFALLS OF ANALYZER INSTALLATIONS
【24h】

PITFALLS OF ANALYZER INSTALLATIONS

机译:分析仪装置的陷阱

获取原文

摘要

To a project instrument engineer one of the most dreaded words one can hear is "Analyzer". This word brings memories of a bad outcome on a previous project, for many. Somewhere a schedule was blown, costs were overrun, results were less than expected, someone displayed a great deal of displeasure at the end result, or the engineer just wound up looking bad. It is desirable that someone with analyzer experience would do all the analyzer installations and the good stuff would be left for the instrument people. Most often the problems stem from lack of experience, lack of time, and lack of time to get experience. Time is money and most managers want to limit the up-front hours in the estimate to keep the cost down. This paper attempts to outline the steps necessary to have a successful analyzer installation, identify the pitfalls, and to justify the front-end time needed to complete the project correctly.
机译:对于一个项目仪器工程师,可以听到最可怕的单词之一是“分析仪”。这个词为许多人带来了对先前项目的糟糕结果的回忆。在某个时间表被吹来的时间内,成本溢出,结果少于预期,有人在最终结果中表现出很大的不满,或者工程师刚刚过来看起来很糟糕。希望有分析仪体验的人会做所有分析仪安装,并且将为仪器人员留下好东西。最常见的问题源于缺乏经验,缺乏时间,缺乏时间来获得经验。时间是金钱,大多数经理想要限制估计的上半年,以保持成本。本文试图概述具有成功分析仪安装的步骤,识别陷阱所需的步骤,并证明正确完成项目所需的前端时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号