首页> 外文会议>Proceedings of the 42nd Annual Conference on Deep Foundations >PRESCRIPTIVE SPECIFICATION DESIGN: THE IMPACT ON COST AND CONSTRUCTABILITY – CASE HISTORY
【24h】

PRESCRIPTIVE SPECIFICATION DESIGN: THE IMPACT ON COST AND CONSTRUCTABILITY – CASE HISTORY

机译:规范性规范设计:对成本和可构造性的影响-案例历史

获取原文
获取原文并翻译 | 示例

摘要

This paper outlines how specification driven design has made Toronto Area transit infrastructure projectsrnmore expensive than similar private projects, and provides a case study of the results of an excavation atrnLaunch Shaft 1 (LS1) for the Eglinton Crosstown Light Rail Transit project in Toronto, Ontario. Thernpaper will describe the impact specification driven design parameters can have on design economy,rnconstructability, and schedule and will suggest an alternative approach utilizing the ObservationalrnMethod. As a result of the initial specification based design, Isherwood was retained by both the GeneralrnContractor and the Specialty Excavation Shoring Contractor to provide value engineering leveraging thernObservational Method to improve constructability and construction schedule. By using well known,rnaccepted design methods coupled with local experience in lieu of the specified design pressures andrnparameters, the redesigned bracing scheme reduced construction cost and schedule. This excavation casernhistory can be a lesson learned for future transit projects.
机译:本文概述了规范驱动的设计如何使多伦多地区的交通基础设施项目比同类私人项目更为昂贵,并为安大略省多伦多的Eglinton Crosstown轻轨交通项目的发掘竖井1(LS1)开挖结果提供了案例研究。该论文将描述规范驱动的设计参数可能对设计经济性,可施工性和进度产生的影响,并将提出一种利用观察方法的替代方法。作为基于初始规范的设计的结果,Isherwood被GeneralrnContractor和专业挖掘支持承包商保留,以利用rnObservational方法提供价值工程,以改善可施工性和施工进度。通过使用众所周知的,不被接受的设计方法以及当地经验来代替指定的设计压力和参数,重新设计的支撑方案降低了施工成本和进度。这种挖掘案例的历史可以为将来的运输项目学习。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号