首页> 外文会议>Proceedings of the 15th African regional conference on soil mechanics and geotechnical engineering : Resource and infrastructure geotechnics in Africa: putting theory into practice. >Reducing the cost of road construction through targeted geotechnical and geophysical investigations - a case study of road section re-design in the Hwereso valley of Ghana
【24h】

Reducing the cost of road construction through targeted geotechnical and geophysical investigations - a case study of road section re-design in the Hwereso valley of Ghana

机译:通过有针对性的岩土工程和地球物理勘测降低道路建设的成本-以加纳赫韦雷索河谷路段重新设计为例

获取原文
获取原文并翻译 | 示例

摘要

The Hwereso valley that is crossed by a section of the main highway linking the north and south of Ghana, is a 2.0km wide flood plain formed by tributaries of the Hwere River in the Ashanti Region of Ghana. Prior to its reconstruction in 2004, as part of the general upgrading of the Accra-Kumasi highway, this section of the road was subjected to perennial flooding and pavement failures as a result of an incompetent clay sub grade. The original road upgrade design recommended the construction of a bridge with piled foundation across the Hwere and an embankment across the valley. Through detailed geotechnical investigation targeted at this section of the road during the construction stage, the soil profile along the centerline of the road was defined in detail and a complete characterization of the subsoil soil materials undertaken. The depth to bedrock was determined from seismic refraction surveys. Based on the results of these detailed investigations, the drainage structures and foundation design were revised to a large, single bay box culvert with 3No helper pipe culverts. The idea of a 2km long embankment across the valley was abandoned and subsoil drainage system consisting of French drains was adopted to eliminate accumulation of water around the culverts inlets. The redesign enabled the project to avoid the expensive piling exercise and large volume earthworks of the embankment construction recommended in the initial upgrade design thereby making savings in the project cost and construction time.
机译:Hwereso山谷被连接加纳北部和南部的主要高速公路的一部分横穿,是加纳阿散蒂地区Hwere河支流形成的2.0公里宽的洪泛区。在2004年进行重建之前,作为阿克拉-库马西高速公路总体升级的一部分,这部分路段由于粘土等级不高而常年遭受洪水和路面破坏。最初的道路升级设计建议建造一座横跨Hwere的桩基和横跨山谷的堤防的桥梁。通过在施工阶段针对此路段进行详细的岩土工程勘测,详细定义了沿路中心线的土壤剖面,并对底土土壤材料进行了全面表征。基岩的深度是根据地震折射调查确定的。根据这些详细调查的结果,将排水结构和地基设计修改为具有3No辅助管道涵的大型单湾箱涵。放弃了横跨山谷的2公里长路堤的想法,并采用了由法国排水沟组成的地下排水系统,以消除涵洞入口附近的积水。重新设计使该项目避免了最初的升级设计中建议的昂贵的打桩工作和路堤施工中大量土方工程,从而节省了项目成本和施工时间。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号