首页> 外文会议>Proceedings of the 13th International Symposium on Structural Engineering >MONITORING AND ANALYSIS OF SHENYANG BOGUAN BRIDGE DURING CONSTRUCTION BASED ON AN INTEGRATION HEALTH MONITORING SYSTEM
【24h】

MONITORING AND ANALYSIS OF SHENYANG BOGUAN BRIDGE DURING CONSTRUCTION BASED ON AN INTEGRATION HEALTH MONITORING SYSTEM

机译:基于综合健康监测系统的沉阳博关大桥施工监测与分析

获取原文
获取原文并翻译 | 示例

摘要

Shenyang Boguan Bridge is the first half-through 6-span X skew arch bridge in China.To ensure the safety during its construction and service,a permanent structure health monitoring system is imported.In this paper,the schemes of placement of measuring points,as well as the function and composition of the monitoring system are introduced.To ensure the safety of steel-concrete connection position as construction activity progresses,the stress evolution of these positions were investigated through the monitoring system The monitoring exercise provides valuable data for the safety of bridge construction.It verifies the effectiveness and importance of monitoring during the construction phase for such a complex long-span arch bridge.
机译:沉阳博观大桥是中国第一座半跨X跨X斜拱桥。为确保其施工和使用过程中的安全,引进了永久性结构健康监测系统。本文提出了测点布置方案,介绍了监控系统的功能和组成。为确保随着施工活动的进行,钢筋混凝土连接位置的安全性,通过监控系统研究了这些位置的应力变化。监控工作为安全提供了有价值的数据它验证了这种复杂的大跨度拱桥在施工阶段进行监控的有效性和重要性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号