首页> 外文会议>International Symposium on Structural Engineering >MONITORING AND ANALYSIS OF SHENYANG BOGUAN BRIDGE DURING CONSTRUCTION BASED ON AN INTEGRATION HEALTH MONITORING SYSTEM
【24h】

MONITORING AND ANALYSIS OF SHENYANG BOGUAN BRIDGE DURING CONSTRUCTION BASED ON AN INTEGRATION HEALTH MONITORING SYSTEM

机译:基于集成健康监测系统的施工期间沉阳八瓜桥监测与分析

获取原文

摘要

Shenyang Boguan Bridge is the first half-through 6-span X skew arch bridge in China.To ensure the safety during its construction and service,a permanent structure health monitoring system is imported.In this paper,the schemes of placement of measuring points,as well as the function and composition of the monitoring system are introduced.To ensure the safety of steel-concrete connection position as construction activity progresses,the stress evolution of these positions were investigated through the monitoring system The monitoring exercise provides valuable data for the safety of bridge construction.It verifies the effectiveness and importance of monitoring during the construction phase for such a complex long-span arch bridge.
机译:沉阳鲍滦桥是中国上第一座6跨度X偏斜拱桥。确保在其建筑和服务期间的安全,将导入永久的结构健康监测系统。本文,测量点的展示计划,介绍了监测系统的功能和组成。确保钢混凝土连接位置的安全性随着施工活动的进展,通过监测系统调查了这些立场的应力演化,监测练习为安全提供了有价值的数据作者:王莹,桥梁施工学验证了在施工阶段监测的效果和重要性,为这种复杂的长期拱桥。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号