首页> 外文会议>Powersystems World Conference amp; Exhibit; 20031104-20031106; Long Beach,CA; US >Power Quality Monitoring -Too Little? Too late? Too much? And what are we going to do with all that data anyway?
【24h】

Power Quality Monitoring -Too Little? Too late? Too much? And what are we going to do with all that data anyway?

机译:电能质量监控-太少了?太晚了?太多了?而且我们将如何处理所有这些数据?

获取原文
获取原文并翻译 | 示例

摘要

This paper discusses the past, present and future of Power Quality Monitoring from a Data Center Building Manager's perspective. The technology available to us today is incredible. The tools we have at our disposal enable us to dissect a sine wave down to the most minute detail. We can look at the harmonics content of our voltage and current out to the umpteenth harmonic. We can determine exactly when, where and why a voltage fluctuation occurred. We can graphically depict phase angle relationships. But how much of this stuff is really important to the Building Manager, and how much is just plain fluff?
机译:本文从数据中心大厦经理的角度讨论了电能质量监控的过去,现在和未来。今天我们可以使用的技术令人难以置信。我们可以使用的工具使我们能够将正弦波分解到最细微的细节。我们可以看一下电压和电流的谐波含量,直到第十二个谐波为止。我们可以准确确定何时,何地以及为什么发生电压波动。我们可以用图形描述相角关系。但是,这些东西中有多少对建筑经理来说真的很重要,而仅仅是绒毛呢?

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号