INTEGRATED SUPERVISORY AND CONTROL SYSTEM FOR LARGE-SCALE COAL THERMAL POWER PLANT IN CHINA

机译:中国大型煤炭热电厂综合监控系统

获取原文
获取原文并翻译 | 示例

摘要

In China, large-scale coal thermal power plants have been built hurriedly in response to the rapid growth of the electric power demand. For newly constructed large-scale power plant, high degree of automation, improvement of operability, and reinforcement of abnormality management are required. Supervisory control system is required to include high-efficiency operation support system and power plant business management support system.rnUnder this circumstance, Shanghai Waigaoqiao Phase II project, the largest single power generation unit in China 900MWx2, has employed the newly developed integrated supervisory and control system, Hitachi Integrated Autonomous Control System, HIACS-5000M, and started the commercial operation in 2004. Waigaoqiao project consists of several portions: turbine island supplied by SIEMENS, boiler island supplied by ALSTOM, BOP (Balance of Plant) island supplied by various manufacturers and I&C (Instrumentation and Control) island supplied by HITACHI. The I&C island consists of DCS (Distributed Control System): HIACS-5000M, SIS (Supervisory Information System), MIS (Management Information System), and the plant simulator. DCS is used for each units and common part, and SIS, MIS, and the plant simulator are for operation support, for business management support, and for education support. In order to realize the above-mentioned requirements, various new technologies are applied in DCS. RTB (Remote Terminal Block) is used for the connection between DCS and the field, so the number of cable and construction cost has significantly decreased. The standard MODBUS interfaces are used for the connection between DCS and PLCs used in BOP and others, the supervising and operations in the central control room have been improved. HITACHI'S experience for the super critical pressure plant control is used for the control technology, so the response to the demand of the electric power system has been improved. For the provision against the abnormality of the plant equipments and the electric power system, thernrunback and FCB (Fast Cut Back) functions are applied, which were verified in the commission test.rnEspecially, the FCB function met with the first success in China. It leads to the improvement ofrnreinforcement for the abnormality of the electric power system.rnBoth schedules of unit 1 and unit 2 of Shanghai Waigaoqiao Phase II project were moved up, and theyrnstarted the commercial operations on April 2004 and on September 2004 after long-term reliabilityrntests.
机译:在中国,为响应电力需求的快速增长,已迅速兴建大型燃煤电厂。对于新建的大型发电厂,需要高度的自动化,改进的可操作性以及加强异常管理。要求监控系统包括高效运行支持系统和电厂业务管理支持系统。在这种情况下,中国最大的900MWx2单一发电装置上海外高桥二期项目采用了新开发的集成监控系统系统,日立综合自主控制系统HIACS-5000M,于2004年投入商业运行。外高桥项目包括多个部分:西门子提供的涡轮机岛,阿尔斯托姆提供的锅炉岛,多家制造商提供的BOP(工厂平衡)岛和HITACHI提供的I&C(仪器与控制)岛。 I&C岛由DCS(分布式控制系统):HIACS-5000M,SIS(监控信息系统),MIS(管理信息系统)和工厂模拟器组成。 DCS用于每个单元和公共部分,SIS,MIS和工厂模拟器用于操作支持,业务管理支持和教育支持。为了实现上述要求,在DCS中应用了各种新技术。 DCS与现场之间使用RTB(远程端子排)进行连接,因此电缆数量和施工成本已大大降低。标准的MODBUS接口用于DCS和BOP等中使用的PLC之间的连接,改进了中央控制室中的监视和操作。 HITACHI在超临界压力设备控制方面的经验被用作控制技术,因此提高了对电力系统需求的响应。为了防止工厂设备和电力系统的异常,应用了rnrunback和FCB(快速切回)功能,并在调试测试中进行了验证。特别是,FCB功能在中国取得了首次成功。上海外高桥二期工程的1号机组和2号机组的时间表都被调高,并在经过长期可靠性测试后于2004年4月和2004年9月开始商业运营。 。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号