BREATHING NEW LIFE INTO AN OLD PLANT

机译:将新生命带入旧厂房

获取原文
获取原文并翻译 | 示例

摘要

After 15 years running on proprietary hardwired distributed control system, TNB’s SultanrnSalahuddin Abdul Aziz Power Station Unit No. 2 (300MW-Gas/Oil-fired) underwentrnmajor control system rehabilitation recently. This timely decision was made chiefly duernto the imminent obsolency and limitations of the original control system. Following anrnoutage of 70 days for Distributed Control System (DCS) revamp, turbine controls retrofit,rnplant overhaul and modification works, the unit was successfully re-commissioned. Withrnfurther on-line testing and fine-tuning, the unit is now running at full capacity with itsrnnew open architecture DCS and turbine control system.rnIn this paper the authors present their experience in managing the various stages of thernproject and the technical aspects involved. As the number of plants in the regionrnconsidering control system rehabilitations are expected to rise, the authors hope theirrnexperience here will be able to help in the planning and implementation of such futurernprojects.rnThis paper documented the various phases of the entire project duration starting from thernjustification phase through to approval to planning and specification preparation. This isrnfollowed by the vendor selection, project awarding and design stages to factoryrnacceptance tests. Amongst the most challenging part of the project was the siterninstallation, commissioning, tuning and testing phase, which involved dealing with ‘live’rnsituations. This called for detailed planning and precautions to safeguard personnel andrnequipment safety and minimize downtime. The last phase covered warranty and defectsrnclearance which called for commitment from all parties to ensure the overall project goalsrnare met.rnInteresting aspects illustrated included emphasis on planning and risk aversion, projectrnand design philosophy, technical design options, discrepancies between actual conditionsrnand drawings, various control scheme and plant equipment improvements, limitations
机译:在使用专有的硬线分布式控制系统运行了15年之后,TNB的SultanrnSalahuddin Abdul Aziz 2号电站(300MW燃气/燃油)最近进行了大型控制系统修复。做出这一及时的决定主要是由于原始控制系统的过时和局限性。在中断了70天的分布式控制系统(DCS)改造,涡轮机控制改造,工厂大修和改造工作后,该机组成功重新投入使用。经过进一步的在线测试和微调,该装置现在具有全新的开放式结构DCS和涡轮机控制系统,可以满负荷运行。本文作者介绍了他们在管理项目各个阶段以及所涉及的技术方面的经验。由于预计该地区考虑控制系统修复的工厂数量将会增加,因此作者希望他们的经验能够为此类未来项目的规划和实施提供帮助。从批准到规划和规格制定。随后是供应商选择,项目授予和工厂验收测试的设计阶段。该项目最具挑战性的部分是站点的安装,调试,调试和测试阶段,其中涉及处理“实时”情况。这需要详细的计划和预防措施,以保护人员和设备安全并最大程度地减少停机时间。最后一个阶段涉及保修和缺陷清除,要求各方承诺确保实现总体项目目标。有趣的方面包括强调计划和风险规避,项目和设计理念,技术设计选项,实际条件与图纸之间的差异,各种控制方案和工厂设备的改进,局限性

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号