首页> 外文会议>Port development in the changing world (PORTS 2004) >Increasing Crane Girder Capacity Using the Strut-and-Tie Method
【24h】

Increasing Crane Girder Capacity Using the Strut-and-Tie Method

机译:使用拉杆式方法增加起重机梁的承载能力

获取原文
获取原文并翻译 | 示例

摘要

Over recent decades, vessel size and the weight of the heaviest marine containers have increased, resulting in increased crane reactions to the wharves. The larger ships have greater drafts, which require deeper berths. So many of the Port of Oakland’s existing wharves cannot carry the heavier crane loads and continue to meet the original design criteria. rnThis paper presents the strut-and-tie method of analysis and new criteria for determining the acceptable crane loads on the existing wharves. For most wharves, the new method of analysis increases the acceptable load.
机译:在最近的几十年中,船的尺寸和最重的海运集装箱的重量增加,导致起重机对码头的反应增加。较大的船只吃水更大,需要更深的泊位。奥克兰港现有码头中的许多码头无法承受较重的起重机负载,无法继续满足原始设计标准。 rn本文提出了一种分析法,并提出了确定现有码头可接受的起重机载荷的新标准。对于大多数码头而言,新的分析方法会增加可接受的负载。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号