首页> 外文会议>Pipeline Pigging Integrity Management conference >Multi-diameter, bi-directional pigging for pipeline pre-commissioning
【24h】

Multi-diameter, bi-directional pigging for pipeline pre-commissioning

机译:用于管道预调试的多直径双向清管

获取原文

摘要

This paper examines the issues associated with multi-diameter, bi-directional pigging specifically for pipeline pre-commissioning. The technique can be used to flood and subsequently dewater a pipeline without the need for temporary subsea traps. An example is the Alve Pipeline in Norway. This 16 km flow-line from the Norne Platform to the Alve Manifold includes 10' and 12' pipe sections. The line was flooded from Nome using the pig with oxygen scavenged seawater and then dewatered using Nitrogen and produced gas from the well. The pigs needed to have a high sealing efficiency since very low velocities were used to flood the line and in order to avoid hydrates on dewatering. Multi-diameter wheel pigs were employed with non-buckling disc type seals.
机译:本文研究了专门用于管道预调试的多直径双向清管相关的问题。该技术可用于淹没并随后对管道进行脱水,而无需临时的海底疏水阀。挪威的Alve管道就是一个例子。从Norne平台到Alve Manifold的这条16公里长的输油管包括10'和12'的管段。用猪从Nome用猪清除了管线的氧气清除后的海水,然后用氮气进行了脱水,并从井中产生了天然气。猪需要具有较高的密封效率,因为使用了非常低的速度使管线充满水,并避免了脱水时的水合物。采用多直径轮毂清管器和不变形盘形密封件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号