【24h】

DESIGN AND CONSTRUCTION OF THE CHARENTON CANAL BRIDGE, CHARENTON, LOUISIANA

机译:路易斯安那州查伦顿查伦顿运河大桥的设计与施工

获取原文
获取原文并翻译 | 示例

摘要

In 1999, the State of Louisiana completed construction of its first bridge using high performance concrete for both the superstructure and the substructure. In this prototype bridge, high strength concrete was used in the prestressed concrete piles and girders. High performance concrete (HPC) was used in the pile caps, approach slabs, bridge deck, barrier rails, and wing walls. New specifications were developed for use with high performance concrete. This paper contains a description of the design and construction of the bridge including the special provisions used for the high performance concrete, mix proportions, and results achieved in construction. The successful construction of the bridge demonstrated that an HPC bridge can be designed and built in the State of Louisiana using local materials.
机译:1999年,路易斯安那州完成了其第一座桥梁的建造,该桥的上部结构和下部结构均使用高性能混凝土。在该原型桥中,高强度混凝土用于预应力混凝土桩和大梁中。高性能混凝土(HPC)用于桩帽,进近板,桥面,护栏和翼墙。开发了适用于高性能混凝土的新规格。本文描述了桥梁的设计和施工,包括用于高性能混凝土的特殊规定,配合比以及在施工中取得的成果。桥梁的成功建造表明,可以使用本地材料在路易斯安那州设计和建造HPC桥梁。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号