首页> 外文会议>PCI/FHWA/FIB international symposium on high performance concrete >DESIGN AND CONSTRUCTION OF THE CHARENTON CANAL BRIDGE, CHARENTON, LOUISIANA
【24h】

DESIGN AND CONSTRUCTION OF THE CHARENTON CANAL BRIDGE, CHARENTON, LOUISIANA

机译:Charenton Canal Bridge,Charenton,路易斯安那州的设计与施工

获取原文

摘要

In 1999, the State of Louisiana completed construction of its first bridge using high performance concrete for both the superstructure and the substructure. In this prototype bridge, high strength concrete was used in the prestressed concrete piles and girders. High performance concrete (HPC) was used in the pile caps, approach slabs, bridge deck, barrier rails, and wing walls. New specifications were developed for use with high performance concrete. This paper contains a description of the design and construction of the bridge including the special provisions used for the high performance concrete, mix proportions, and results achieved in construction. The successful construction of the bridge demonstrated that an HPC bridge can be designed and built in the State of Louisiana using local materials.
机译:1999年,路易斯安那州的国家使用高性能混凝土完成其第一座桥的建设,用于上层建和子结构。在该原型桥梁中,预应力混凝土桩和梁中使用了高强度混凝土。高性能混凝土(HPC)用于桩帽,接近板,桥甲板,屏障轨道和翼墙。开发了新规格,用于高性能混凝土。本文包含了桥梁设计和结构的描述,包括用于高性能混凝土,混合比例的特殊规定,以及在施工中实现的结果。该桥梁的成功建设证明了HPC桥可以使用本地材料设计和建造路易斯安那州的状态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号