首页> 外文会议>PCI 60th anniversary 2014 convention and national bridge conference >First Two-Stage PT Wide-Flange Girder Bridge in California
【24h】

First Two-Stage PT Wide-Flange Girder Bridge in California

机译:加州第一座两阶段PT宽法兰箱梁桥

获取原文
获取原文并翻译 | 示例

摘要

The first post-tensioned spliced wide-flange girder bridge, which is Riego Road Overcrossing, has been designed by California Department of Transportation (Caltrans) two years ago. Now it has been constructed and the new bridge is expected to be open at the end of this year. The project is a new interchange at Riego Road and State Highway 99 in southern Sutter County. The bridge has two spans, 154’ and 141’, over Hwy 99. Cost of the project is $31 millions. Caltrans’ new standard PT wide-flange girders have been used for this project. Since this is the first California post-tensioned spliced wide-flange girder bridge designed by Caltrans, it faced many challenges from the different phrases. Feasibility, design ability, constructability and cost are being challenged along the whole project process. During the design, manufacture and construction, Caltrans worked with the Contractor and the precast sub-contractor to have solved various problems. There are several lessons learned from this project. Caltrans has developed two new and improved standard precast wide-flange girder shapes in recent years. One of the new girder types, post-tensioned WF girder type, has the span capability of exceeding 200 ft, which is very comparable to those of cast-in-place post-tensioned box girders. Combined with the use of high-strength concrete, the spans and girder spacing can be maximized. The standard 8-inch web is for post-tensioned girders where splicing for continuity is applied. The new girders serve to promote the Accelerated Bridge Construction (ABC), as well as economic design. This paper illustrates Riego Road Project as a case study to present the design, shop drawing review, manufacture and construction for this new post-tensioned spliced WF girders project. The author wants to share the valuable experience and important information with other State Agencies and PCI members about using precast girders for long span bridges.
机译:加利福尼亚交通运输部(Caltrans)于两年前设计了第一座后张拉的拼接宽翼梁桥,即里戈路立交桥。现在已经建造完毕,新桥预计在今年年底开放。该项目是位于萨特县南部的里戈路和99国道的新交汇处。该桥有两个跨度分别为154英尺和141英尺,横跨99号高速公路。该项目的成本为3,100万美元。此项目使用了Caltrans的新标准PT宽法兰梁。由于这是Caltrans设计的第一座加利福尼亚州后张连接的拼接大法兰箱梁桥,因此它面临着来自不同短语的许多挑战。在整个项目过程中,可行性,设计能力,可施工性和成本都面临着挑战。在设计,制造和施工期间,Caltrans与承包商和预制分包商合作解决了各种问题。从该项目中学到了一些教训。近年来,Caltrans已开发出两种新的和改进的标准预制宽法兰箱梁形状。后张式WF梁是一种新的梁类型,其跨度超过200英尺,这与现浇后张式箱梁的可比性非常相称。结合使用高强度混凝土,可以使跨度和梁间距最大化。标准的8英寸腹板用于后张大梁,其中采用了连续性拼接。新的梁用于促进加速桥梁建设(ABC)以及经济设计。本文以Riego道路项目为例,介绍了这个新的后张连接WF大梁项目的设计,施工图审查,制造和施工。作者希望与其他国家机构和PCI成员分享有关将预制梁用于大跨度桥梁的宝贵经验和重要信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号