BOEING NORTH BRIDGE: LESSONS LEARNED IN ACCELERATED BRIDGE CONSTRUCTION

机译:波音北桥:加速桥建设中的经验教训

获取原文
获取原文并翻译 | 示例

摘要

The Boeing North Bridge is a multi-span girder bridge spanning the Cedar River in Renton, Washington. All aircraft assembled in the Boeing Renton factory get towed over the bridge in order to access Renton Field where the aircraft undergo final inspections before taking-off from the Renton Airport. The design and construction schedule for the bridge was accelerated in order to meet Boeing’s increased production rate and plans for production of the new 737MAX. In response to the accelerated schedule and its impacts on timing of construction activities around environmental work windows and the winter construction season, the new bridge was designed utilizing precast columns, precast crossbeams, and full-depth precast deck panels. This paper summarizes decisions made by the design team to use prefabricated bridge elements along with their perceived advantages. These decisions are then contrasted with the construction methods the Contractor elected to follow along with explanations as to why the methods were elected.
机译:波音北桥是横跨华盛顿州伦顿的锡达河的多跨大梁桥。在波音伦顿工厂组装的所有飞机都被拖到桥上,以进入伦顿机场,飞机在从伦顿机场起飞之前经过最终检查。为了满足波音公司不断提高的生产率和新型737MAX的生产计划,加快了桥梁的设计和施工进度。为了响应进度加快及其对环境工作窗和冬季施工季节周围施工活动时间的影响,新桥采用了预制柱,预制横梁和全深度预制甲板面板进行设计。本文总结了设计团队做出的使用预制桥梁元素的决策以及它们的感知优势。然后将这些决定与承包商选择遵循的施工方法进行对比,并说明为什么选择了这些方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号