首页> 外文会议>PCI 60th anniversary 2014 convention and national bridge conference >NEW HYBRID~2-TOWERS OPTIMIZE THE CONSTRUCTION AND ASSEMBLING OF ONSHORE WIND TURBINES
【24h】

NEW HYBRID~2-TOWERS OPTIMIZE THE CONSTRUCTION AND ASSEMBLING OF ONSHORE WIND TURBINES

机译:新型HYBRID〜2塔优化了上风轮机的建造和组装

获取原文
获取原文并翻译 | 示例

摘要

For the yield of renewable energies, wind offers many capabilities. The development and enhancement of wind turbines have a strong demand worldwide.rnEspecially, land-based turbines are in the need of immense hub heights (over 100m) to ensure economic operations. Involving that the turbines will become massive and require large transport plus assembly works.rnA research project funded by the State of Hesse, Germany, represent the most economical solution for high towers of wind turbines- the hybrid²-towers. The hybrid²-towers combine the materials concrete and steel analogous to their properties and thus improve the performance of the whole structure. The construction consists of prefabricated quarter-circle shaped concrete elements, which are connected with each other by a framework of common rolled steel sections or concrete beams to accelerate the operations on-site.rnWith this innovative construction principle, the self-weight of the concrete tower can be decreased up to 40 % in comparison to a full concrete tower and the costs for the assembling will be reduced tremendously.
机译:为了产生可再生能源,风能提供许多功能。全世界对风力涡轮机的开发和增强有很强的需求。特别是,陆基涡轮机需要巨大的轮毂高度(超过100m)以确保经济运行。涉及的涡轮机将变得庞大,需要大量的运输和组装工作。rn德国黑森州资助的一项研究项目,代表了风力涡轮机高塔-混合动力塔-最经济的解决方案。混合式2塔式建筑将类似于其性能的混凝土和钢材组合在一起,从而改善了整个结构的性能。该建筑由预制的四分之一圆形混凝土构件组成,这些构件通过共同的轧制型钢或混凝土梁框架相互连接,从而加快了现场作业的速度。与完整的混凝土塔相比,该塔最多可减少40%,并且安装成本将大大降低。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号