【24h】

Atlanta Field: Developing Heavy and Viscous Oil in a Challenging Environment

机译:亚特兰大油田:在充满挑战的环境中开发稠油和粘稠油

获取原文
获取原文并翻译 | 示例

摘要

Atlanta is a post-salt oil field located in the original Block BS-4 ring fence, 185 km off the city of Riornde Janeiro, in the Santos Basin, Brazil, under water depth of approximately 1550 m. However, AtlantarnField is not just another ultra-deepwater project; for its development, several other challenges shall bernovercome, such as the low burial depth, its highly unconsolidated sandstone reservoir, the heavy andrnviscous crude flow assurance, the need for high power artificial lift pumping system, and the complexrncrude treatment at topsides, among others.rnThe field was discovered in 2001, followed by an appraisal program with a vertical well drilled yet inrnthe same year to test the high porosity Eocenic unconsolidated sandstones and sample its heavy andrnviscous oil (14°API and 228 cP in reservoir conditions). In 2006, a horizontal well proposed to test thernfield development concept cast a shadow in the reliability of the project after facing several drilling,rncompletion and production problems imposed by the high challenging environment. These included poorrndirectional control leading to phase abandonment and well sidetracking, massive fluid loss, gravel packingrnfailure, ESP operational issues, partially conclusive drill stem test (DST), and a severe damaged wellborern(skin u0002 40).rnAfter considering technology improvements and revisiting development concepts, an extensive preparationrnand a complete assessment of past operations were performed. During 2013 and 2014 thernconsortium led the drilling, completion and testing of the first two horizontal producers planned for thernfield development. Wells were drilled with good directional control and barely any fluid loss, reproducingrnwith great fidelity the proposed trajectory. They were both completed with sand control screens and gravelrnpacked throughout the 800 m near horizontal (88°) section in the reservoir. A slant section of 80 m wasrnconstructed just before reaching the reservoir for electrical submersible pump (ESP) installation. ThernDSTs were conducted with ESP both near the reservoir and near the seabed to test the performance ofrndifferent artificial lift concepts. Results confirmed the high reservoir permeability and the great performancernof the drilling and completion phases, delivering the first two producers of the field with nornformation damage. Productivity indexes for both wells were in the high end of the expected performance.rnThis paper presents a full review of the Atlanta Field, emphasizing its main challenges and how theyrnwere overcome by the successful construction and testing of the first two production wells, recovering thernreliability of the project and encouraging the consortium to move on to the next phase. Also, the updatedrnfield development plan is described, highlighting the challenges to be faced during the next phase of thernproject.
机译:亚特兰大是一个盐下油田,位于原始的BS-4区块环形围网中,距巴西桑托斯盆地的里奥内德·简内罗市185公里,水下深度约1550 m。但是,亚特兰大菲尔德油田(AtlantarnField)不仅是另一个超深水项目,它还可以为您带来更多收益。就其发展而言,将面临其他一些挑战,例如低埋深,高度疏松的砂岩储层,重稠粘稠的原油流量保证,需要大功率的人工举升抽水系统以及在顶部进行复杂的原油处理等。 rn该油田于2001年被发现,随后进行了一项评估计划,同年钻了一个垂直井,但尚未钻探,以测试高孔隙度的始新世未固结砂岩并对其重稠粘稠油进行采样(在储层条件下为14°API和228 cP)。 2006年,在面临高挑战性环境带来的数个钻井,完井和生产问题后,提议的用于测试油田开发概念的水平井为该项目的可靠性蒙上了一层阴影。这些包括方向控制不良导致阶段弃井和侧井追踪,大量流体流失,砾石堆积失效,ESP操作问题,部分结论性钻杆测试(DST)和严重损坏的井筒(皮肤u0002 40)。考虑技术改进并重新开发后概念,广泛的准备工作和对过去操作的完整评估。在2013年和2014年,Thern财团领导了计划进行Thenfield开发的前两家水平生产商的钻探,完工和测试。井的钻进具有良好的方向控制能力,几乎没有流体流失,并以高保真度再现了拟议的轨迹。它们都用防砂筛完成,并在整个储层800 m附近水平(88°)断面堆放了砾石。在到达蓄水池以安装潜水电泵(ESP)之前,已经修建了80 m的倾斜段。 DST是在储层和海床附近用ESP进行的,目的是测试不同人工举升方案的性能。结果证实了较高的储层渗透率和在钻井和完井阶段的出色性能,使该油田的前两个生产商遭受了规范化破坏。两口井的生产率指标均处于预期性能的高端。本文对亚特兰大油田进行了全面回顾,强调了其主要挑战以及如何通过成功建造和测试前两口生产井来克服这些挑战,从而恢复了油井的可靠性。该项目,并鼓励财团进入下一阶段。此外,还介绍了更新的油田开发计划,重点介绍了该项目下一阶段将面临的挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号