The World’s First Deepwater Multiphase Pumping Application above 100bar △P, Technological Risks and Mitigations

机译:世界上第一个高于100bar△P的深水多相泵送应用,技术风险和缓解措施

获取原文
获取原文并翻译 | 示例

摘要

The Girassol Resources Initiatives (GirRI) is a major brownfield deepwater project, which seeks tornoptimize the Girassol FPSO production. It is also the third subsea boosting project being developedrnoffshore Angola by Total, the operator, and OneSubsea, the contractor. High boost multiphase pumpsrn(MPPs), with an operating △P of 110 bar at 53% GVF are deployed subsea on two existing deepwater oilrnproduction loops to enhance the Rosa field reserves and production, a world’s first for the oil and gasrnindustry.rnBefore using a new pump at the leading edge of technology, an extensive qualification program andrna series of stringent acceptance tests were waranted to demonstrate the soundness of the design.rnDeveloping the first high boost MPP application also required revisiting the subsea pumping stationrnarchitecture to mitigate as many of the risks as possible associated with pumping a multiphase fluid at highrnpressure.rnThis paper details how the Project Team addressed the risks associated with multiphase pumping abovern100 bar △P, and how the contractor met all the requirements specified by the operator to build a robustrnone design-fits-all pumping solution.
机译:吉拉斯索尔资源计划(GirRI)是一个重要的褐地深水项目,旨在对吉拉斯索尔FPSO的生产进行优化。这也是运营商道达尔(Total)和承包商OneSubsea在安哥拉近海开发的第三个海底推进项目。在两个现有的深水采油回路上,在海底部署了高增压多相泵rn(MPP),其△P在53%GVF时为110 bar。这是世界上第一个油气工业。新型泵处于技术领先地位,广泛的认证计划和一系列严格的验收测试都在证明设计的合理性。开发第一个高增压MPP应用还需要重新研究海底泵站架构,以减轻许多风险本文详细介绍了项目团队如何解决与100 bar△P以上的多相泵送相关的风险,以及承包商如何满足运营商指定的所有要求,以构建坚固的rnone-fit-所有抽水解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号