Use of a Good-Enough Strategy to Reduce Costs of Development of Deep Offshore Brown-Field Marginal Infill Reservoir

机译:采用适当的策略来降低深海近海褐场边缘填充油藏的开发成本

获取原文
获取原文并翻译 | 示例

摘要

Girassol Miocene M14 project, a Brown Field subsea tie-back to Girassol FPSO on Block17 in Angola,rnwas suspended after pre-project/FEED studies to give priority to more profitable developments. In arnpermanent attempt to develop the upside reserves of TOTAL Angola portfolio at the best costs, anrnalternative development scenario was envisaged early 2015 considering the use of stock drilling tubular,rncompletion equipment as well as SPS equipment, the reuse of existing XTs recovered from depletedrnGirassol wells, the selection of minimum functionalities system.rnThis paper presents how a u0002good-enoughu0002 strategy has been used to generate real cost savings andrnschedule optimization for the project. All together, this is a first-of-a-kind for deepwater fields in TOTAL.
机译:Girassol中新世M14项目是布朗油田与安哥拉Block17上Girassol FPSO的海底绑扎项目,在项目前/ FEED研究之后,为了优先考虑更多有利可图的开发,该项目被暂停。为了永久性地以最佳成本开发安哥拉总资产组合的向上储量,考虑到使用库存钻探管,完井设备以及SPS设备,对从耗尽的吉拉索尔井中回收的现有XT进行再利用,设想在2015年初进行另一种开发方案本文介绍了如何使用u0002good-enoughu0002策略为项目节省实际成本并优化计划。总体而言,这是TOTAL中首创的深水油田。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号