首页> 外文会议>Offshore Technology Conference;ExxonMobil;Aseeder;Schlumberger >The Stones Project: Subsea, Umbilical, Riser and Flowline Systems
【24h】

The Stones Project: Subsea, Umbilical, Riser and Flowline Systems

机译:石材项目:海底,脐带,立管和出油管系统

获取原文
获取原文并翻译 | 示例

摘要

The Stones project is located in the Walker Ridge (WR) area approximately 200 miles due south of NewrnOrleans in 9,500 feet of water. The host facility is a Floating Production Storage and Offloading (FPSO)rnvessel with a disconnectable buoy that allows the FPSO to move off site in a hurricane event. Subsea wellsrnare located in daisy chained drill centers that tie back to the FPSO via dual Steel Lazy Wave Risers andrnsubsea flowlines. Other key subsea infrastructure includes two production manifolds, eight subsea trees,rnumbilicals and an artificial lift system. Produced gas is exported through a lateral pipeline which ties intornthe Walker Ridge Gathering System located in WR 457.rnThis paper provides an overview of the subsea and flowline system, overall flow assurance strategy, arndescription of the gas export pipeline, and challenges encountered during execution of the project.rnKey challenges include the water depth at the site, furrowed seabed, metocean conditions, slope stabilityrnalong the Sigsbee escarpment, the disconnectable buoy, flow assurance and changes mid execution due torndeep and difficult wells.
机译:Stones项目位于沃克岭(WR)地区,距NewrnOrleans以南约200英里,距水面9,500英尺。主机设施是带有浮标的浮式生产存储和卸载(FPSO)容器,在发生飓风时,FPSO可以移离现场。海底井位于菊花链式钻探中心中,通过双钢懒惰冒口和海底出油管与FPSO相连。其他重要的海底基础设施包括两个生产总管,八棵海底树木,绳索和人工举升系统。产生的天然气通过连接至WR 457的Walker Ridge采集系统的横向管道输出。本文概述了海底和输油管道系统,总体流量保证策略,输气管道的详细描述以及在执行过程中遇到的挑战。关键挑战包括现场的水深,海床沟壑,海洋状况,Sigsbee陡坡的斜坡稳定性,可分离的浮标,流量保证以及由于深井和困难井而造成的中期变更。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号