首页> 外文会议>Offshore Technology Conference (OTC 2012). >Slickline-Retrievable Wellhead Plugs and Downhole Plugging System Provides Wellbore Integrity for Extreme HPHT Environments
【24h】

Slickline-Retrievable Wellhead Plugs and Downhole Plugging System Provides Wellbore Integrity for Extreme HPHT Environments

机译:Slickline可回收井口塞和井下堵塞系统为极端HPHT环境提供井眼完整性

获取原文
获取原文并翻译 | 示例

摘要

Trends in offshore exploration continually push the definition of high pressure and high temperature in regards to oil and gas well completions. Recent discoveries in the Gulf of Mexico (GOM) are opening up vast reserves of natural gas and these discoveries are again challenging that definition. To meet the need of high-pressure, high-temperature (HPHT) applications in general and for an operator in one such HPHT field, an ultra high-pressure and high-temperature rated wellhead plug and downhole plugging system has been developed to provide wellbore integrity in extreme conditions.rnThis paper addresses the challenges associated with development of slickline-retrievable equipment rated to 25,000 psi at temperature extremes from 32°F to 450°F and the approaches used to overcome those challenges. A review of design considerations, sealing technology, design verification, and validation testing that exceeds industry standards, is also provided.
机译:海上勘探的趋势不断推动关于油气井完井的高压和高温的定义。墨西哥湾(GOM)的最新发现正在开放大量天然气,这些发现再次挑战了这一定义。为了总体上满足高压,高温(HPHT)应用的需求以及对于此类HPHT领域中的操作员,已经开发了超高压和高温额定井口塞和井下堵塞系统,以提供井眼本文探讨了在32°F至450°F的极端温度下开发额定压力为25,000 psi的可回收钢丝的设备所面临的挑战,以及克服这些挑战的方法。还提供了对设计注意事项,密封技术,设计验证和超出行业标准的验证测试的审查。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号