首页> 外文会议>Observatory operations: Strategies, processes, and systems IV. >The building blocks for JWST Iamp;amp;T to operations: from simulator to flight units
【24h】

The building blocks for JWST Iamp;amp;T to operations: from simulator to flight units

机译:JWST I& T到运营的基础:从模拟器到飞行单元

获取原文
获取原文并翻译 | 示例

摘要

The James Webb Space Telescope (JWST) Project has an extended integration and test (I&T) phase due to longprocurement and development times of various components as well as recent launch delays. The JWST GroundSegment and Operations group has developed a roadmap of the various ground and flight elements and their use in thevarious JWST I&T test programs. The JWST Project's building block approach to the eventual operational systems,while not new, is complex and challenging; a large-scale mission like JWST involves international partners, manyvendors across the United States, and competing needs for the same systems. One of the challenges is resourcebalancing so simulators and flight products for various elements congeal into integrated systems used for I&T and flightoperations activities.This building block approach to an incremental buildup provides for early problem identification with simulators andexercises the flight operations systems, products, and interfaces during the JWST I&T test programs. The JWST Projecthas completed some early I&T with the simulators, engineering models and some components of the operational groundsystem. The JWST Project is testing the various flight units as they are delivered and will continue to do so for theentire flight and operational system. The JWST Project has already and will continue to reap the value of the buildingblock approach on the road to launch and flight operations.© (2012) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
机译:詹姆斯·韦伯太空望远镜(JWST)项目具有扩展的集成和测试(I& T)阶段,这是由于各个组件的采购和开发时间较长以及最近的发射延迟所致。 JWST GroundSegment and Operations小组已经制定了各种地面和飞行要素及其在各种JWST I& T测试程序中的使用的路线图。 JWST项目的最终操作系统的构建方法虽然不是新事物,但它既复杂又具有挑战性。像JWST这样的大规模任务涉及国际合作伙伴,美国许多供应商,以及对相同系统的竞争需求。挑战之一是资源平衡,因此各种要素的模拟器和飞行产品都将融合到用于I& T和飞行运营活动的集成系统中。这种逐步积累的构建方法提供了使用模拟器的早期问题识别并锻炼了飞行操作系统,产品,和在JWST I& T测试程序中的接口。 JWST项目已经完成了一些早期的I& T,其中包括模拟器,工程模型和作战地面系统的某些组件。 JWST项目正在测试交付的各种飞行装置,并将继续对整个飞行和运行系统进行测试。 JWST项目已经并且将继续在发射和飞行操作的道路上获得构建方法的价值。©(2012)COPYRIGHT光电仪器工程师协会(SPIE)。摘要的下载仅允许个人使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号