首页> 外文会议>North American Tunneling Conference; 20040417-22; Atlanta,GA(US) >Slurry type shielded TBM for the alluvial strata excavation in downtown area
【24h】

Slurry type shielded TBM for the alluvial strata excavation in downtown area

机译:市区冲积层开挖的泥浆式盾构掘进机

获取原文
获取原文并翻译 | 示例

摘要

The soil and rock types relevant of construction lot 9 of Seoul subway line number nine ofYeoi Island area show a distinct difference between the eastern and western part of the alignment especially in the eastern part. The tunnel is expected to be located entirely in alluvial deposits, predominantly in sandy gravels with low strength of alluvial soils with presence of groundwater. For the western part, the geological conditions are considerable more complex, varying between hard rocks, residual soils and alluvium, with the higher proportions in weathered rocks. The alluvial deposits probably dominated by sandy gravels including some boulders are expected to be favorable for the application of a slurry shielded TBM with the higher underground water levels. For a more detailed assessment, reliable grain size distribution curves of the alluvial deposits along the tunnel alignment are investigated to select the optimal selection of separation plant and suitable advance rate of the slurry type shielded TBM. Along the whole alignment closed mode tunneling with active face support will be required, due to the low strength of the alluvial soil and the presence of groundwater. There are two basic options for the machine type to be applied: A Slurry type shielded TBM or Earth pressure balanced shielded TBM. For specific details concerning the technical machine operation and the safety precautions of the tunnel construction on this alluvial deposits are described in this paper.
机译:约伊岛地区首尔地铁9号线第9号建设地段的相关土壤和岩石类型显示出该路线的东西方之间存在明显差异,尤其是在东部地区。预计该隧道将完全位于冲积层中,主要位于沙质砾石中,而冲积土的强度低且存在地下水。在西部,地质条件要复杂得多,在硬质岩石,残留土壤和冲积层之间变化,风化岩石中的比例更高。冲积沉积物可能以沙砾为主,包括一些巨石,预计将有利于应用具有较高地下水位的泥浆屏蔽TBM。为了进行更详细的评估,研究了沿隧道路线的冲积物的可靠粒度分布曲线,以选择最佳的分离设备,并选择合适的泥浆类型屏蔽TBM推进速率。沿整个路线,由于冲积土的强度低和地下水的存在,将需要采用主动面支撑的封闭模式掘进。对于要应用的机器类型,有两个基本选项:泥浆型屏蔽TBM或土压力平衡屏蔽TBM。有关冲积沉积物的技术机器操作和隧道施工安全预防措施的具体细节,在本文中进行了描述。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号