Design of Steel Pipe Final Lining Subjected to Large,Seismically Induced Axial Strains

机译:大型轴向应变作用下的钢管最终衬里设计。

获取原文
获取原文并翻译 | 示例

摘要

The Port Mann Main Water Supply Tunnel is a 1,000-m (3,280-ft) long two-pass tunnel. Therntunnel is approximately 3.5-m (11.5-ft) in excavated diameter, and is sized to receive a 2.13-m (7.0-ft) ODrnpipeline as the final liner. The tunnel will be excavated by TBM between two shafts on either side of the FraserrnRiver, British Columbia, Canada. The tunnel has precast segments as initial lining and steel pipe as final lining.rnIt is located in an active seismic region, having a design earthquake with a 10,000-year return period and PGArnof 0.7g. Axial strains of up to 0.4% are anticipated because of seismically induced lateral spreading. This paperrndiscusses seismic design for the final lining to achieve the owner’s seismic performance objectives.
机译:曼港主要供水隧道是一条1,000米(3,280英尺)长的两通隧道。隧道的开挖直径约为3.5米(11.5英尺),其尺寸可容纳2.13米(7.0英尺)OD管线作为最终衬管。隧道将由TBM在加拿大不列颠哥伦比亚省FraserrnRiver两侧的两个竖井之间开挖。该隧道的预制段为初始衬砌,钢管为最终衬砌。rn该隧道位于地震活跃地区,设计地震的回归期为10,000年,PGArnof为0.7g。由于地震引起的横向扩展,预计轴向应变将高达0.4%。本文讨论了最终衬砌的抗震设计,以实现所有者的抗震性能目标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号