首页> 外文会议>North American tunneling 2014 proceedings >Tunnel Boring Machine Selection for the Baltimore Red Line Downtown Tunnel
【24h】

Tunnel Boring Machine Selection for the Baltimore Red Line Downtown Tunnel

机译:巴尔的摩红线市区隧道的隧道掘进机选择

获取原文
获取原文并翻译 | 示例

摘要

The Baltimore Red Line Project by the Maryland Transit Administration (MTA) involves designrnand construction of a three mile long tunnel through downtown Baltimore, enabling light rail service betweenrnresidential and business areas. This paper focuses on the considerations for the selection of an appropriaternTunnel Boring Machine methodology for the Downtown Tunnel contract procurement. Design challengesrnof tunneling beneath downtown Baltimore include: a tight right-of-way; close proximity to historic andrnmodern high-rise buildings; pre-existing underground tunnels and utilities; and extremely challenging groundrnconditions consisting of soil and rock in both full-face and mixed-face conditions. A comprehensive assessmentrnand comparison of state-of-the-art tunnel face support, including innovative hybrid machine techniques withrnearth pressure balance, slurry face control and open-mode capabilities was performed to determine the mostrnsuitable approach for the project.
机译:马里兰州运输管理局(MTA)的巴尔的摩红线项目涉及穿越巴尔的摩市区的三英里长隧道的设计和建造,从而实现住宅区和商业区之间的轻轨服务。本文着重于为市区隧道合同采购选择合适的隧道钻孔机方法的考虑因素。在巴尔的摩市中心下面的隧道设计面临的挑战包括:严格的通行权;靠近历史悠久的现代高层建筑;预先存在的地下隧道和公用设施;以及极富挑战性的地面条件,包括全面和混合面条件下的土壤和岩石。对最先进的隧道工作面支护进行了全面评估和比较,包括具有土压力平衡,泥浆工作面控制和开放模式功能的创新混合动力技术,以确定了该项目的最合适方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号