首页> 外文会议>North American Tunneling Conference >Tunnel Boring Machine Selection for the Baltimore Red Line Downtown Tunnel
【24h】

Tunnel Boring Machine Selection for the Baltimore Red Line Downtown Tunnel

机译:隧道镗床选择巴尔的摩红线市中心隧道

获取原文

摘要

The Baltimore Red Line Project by the Maryland Transit Administration (MTA) involves design and construction of a three mile long tunnel through downtown Baltimore, enabling light rail service between residential and business areas. This paper focuses on the considerations for the selection of an appropriate Tunnel Boring Machine methodology for the Downtown Tunnel contract procurement. Design challenges of tunneling beneath downtown Baltimore include: a tight right-of-way; close proximity to historic and modern high-rise buildings; pre-existing underground tunnels and utilities; and extremely challenging ground conditions consisting of soil and rock in both full-face and mixed-face conditions. A comprehensive assessment and comparison of state-of-the-art tunnel face support, including innovative hybrid machine techniques with earth pressure balance, slurry face control and open-mode capabilities was performed to determine the most suitable approach for the project.
机译:马里兰州过境管理(MTA)的巴尔的摩红线项目涉及通过巴尔的摩市中心的三英里长隧道的设计和建造,在居住和商业区之间提供轻轨服务。本文重点研究了为市中心隧道合同采购选择合适的隧道镗床方法的考虑因素。巴尔的摩市中心下面的隧道设计挑战包括:紧凑的右路;靠近历史和现代高层建筑;预先存在的地下隧道和公用事业;非常具有挑战性的地面条件,包括全面和混合面条条件的土壤和岩石。综合评估和比较最先进的隧道面支持,包括具有地球压力平衡,浆料面控制和开放模式功能的创新的混合机技术,以确定项目的最合适的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号