University Link Project Cross Passage 17:Collaborative Approach Is the Key to Success

机译:University Link项目交叉通道17:协作方法是成功的关键

获取原文
获取原文并翻译 | 示例

摘要

Transit tunnels require cross passages between adjacent main tunnels to provide a safe meansrnof egress or a safe haven in case of emergency. Cross passages are generally excavated under free air usingrnmechanical (sometimes manual) means and present one of the major technical challenges of transit tunnelrnprojects.rnCross Passage 17 is one of 16 cross passages constructed under Contract U220 of Central Puget SoundrnRegional Transit Authority’s University Link Project in Seattle, WA. The cross passage was moved 35 feetrnsouth from its design location after review of data developed during TBM inspection stops indicated groundrnconditions in the originally planned location were poorly suited for excavation. Pre-excavation probe holesrndrilled at the revised location showed no signs for concern, allowing excavation to proceed using the SequentialrnExcavation Method beginning with excavation of the top heading. After completion of the top heading, groundrnwater seepage into the excavation steadily increased reaching a maximum flow rate of more than 200 gallonsrnper minute, along with about 20 to 40 cubic yards of sand adding to the difficulties.rnThis paper presents the cooperative process undertaken by the owner, designer, construction managerrnand contractor which resulted in development of the path forward to successfully complete the cross passagernexcavation, install the final lining and ensure long term stability of the area. Issues and challenges that werernencountered during development and execution of the cross passage work are identified along with steps takenrnto mitigate them.
机译:过境隧道需要相邻主隧道之间的交叉通道,以提供安全的出口或在紧急情况下的避风港。交叉通道通常使用机械方法(有时是手动方法)在空旷的空气中进行开挖,这是过境隧道项目的主要技术挑战之一。rn交叉通道17是根据中央普吉特桑德恩地区交通管理局西雅图大学链接项目的U220合同建造的16个交叉通道之一。 ,华盛顿州。在检查TBM检查站期间开发的数据后,发现交叉路口从其设计位置向南移动了35英尺,这表明原计划位置的地面条件不适合挖掘。在修订后的位置开挖的预开挖探针孔没有引起人们关注的迹象,允许使用SequentialrnExcavation方法从顶部掘进开始进行开挖。顶部钻进完成后,开挖中的地下水渗入量稳步增加,最大流量超过每分钟200加仑,加上约20至40立方码的沙子,这增加了难度。业主,设计师,施工经理和承包商,这为成功完成交叉通道开挖,安装最终衬砌并确保该地区的长期稳定性提供了发展途径。确定了在交叉通道工作的开发和执行过程中遇到的问题和挑战,以及为缓解这些问题而采取的步骤。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号