Successful Fast-Track Construction Sequencing of a Complex Station and Tunnels Project in a Highly Developed Urban Environment

机译:在高度发达的城市环境中成功完成了复杂的车站和隧道项目的快速通道施工顺序

获取原文
获取原文并翻译 | 示例

摘要

New York City’s extensive transit system had not been expanded for several decades untilrnconstruction of the Second Avenue Subway program was re-started in 2006. Many of the construction contractsrnwere performed at an ambitious pace to meet this projected completion date. Phase 1 of the overall programrnincludes three new stations and connecting tunnels over a distance of almost two miles, with restrictive surfacernwork sites and significant operational constraints in a densely developed portion of New York City’s UpperrnEast Side.rnThis paper will describe the highly coordinated methods to plan, sequence, schedule and implement therncomplex 72nd Street Station and Tunnels Project on a fast-tracked 37-month schedule. Construction workrnincluded extensive rock excavation (blasting) for several large caverns, tunnels and shafts as well as finalrnconcrete lining before a sequenced turn-over to follow-on finishes and system-wide contractors. Close coordinationrnand effective communications between the Owner, Contractor, Construction Manager and the DesignrnEngineer during the construction phase contributed to meeting schedule and quality goals that initially seemedrnextremely ambitious and possibly out of reach. Challenges and solutions will be presented with examples thatrnconfirm that the concentrated collaborative approach between the parties was essential for the critical successrnon this very complex and risky project located in a highly developed urban environment in New York City’srnUpper East Side.
机译:纽约市广泛的公交系统几十年来一直没有得到扩展,直到第二大道地铁计划的建设于2006年重新开始。许多建筑合同都以雄心勃勃的步伐执行,以达到预期的竣工日期。总体计划的第一阶段包括在近两英里的距离内新建三个车站和连接隧道,在纽约市上东区人口稠密的地区,地面工作场所受到限制,运营受到严重限制。本文将描述高度协调的规划方法,按照37个月的快速进度安排,安排和实施复杂的第72街车站和隧道项目。施工工作包括对多个大型洞穴,隧道和竖井以及最终的混凝土衬砌进行广泛的岩石开挖(爆破),然后依次移交给后续饰面和全系统承包商。在施工阶段,业主,承包商,施工经理和DesignEngineer之间的密切协调和有效沟通有助于实现进度和质量目标,这些目标最初看起来过于雄心勃勃,甚至可能无法实现。将通过示例来展示挑战和解决方案,这些示例肯定了双方之间集中的协作方法对于至关重要的成功至关重要,因为这个非常复杂,风险很大的项目位于纽约市上东区高度发达的城市环境中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号