首页> 外文会议>North American tunneling 2014 proceedings >Design and Construction Observations of the Neutrino Detection Chamber at Fermi National Accelerator Laboratory
【24h】

Design and Construction Observations of the Neutrino Detection Chamber at Fermi National Accelerator Laboratory

机译:费米国家加速器实验室中微子探测室的设计和施工观察

获取原文
获取原文并翻译 | 示例

摘要

The design approach used to build the new Near Detector Hall (NDH) at Fermilab withoutrnjeopardizing the integrity of the existing MINOS Hall and MINOS Access Tunnel is discussed. The NDH isrnseparated from the existing access tunnel by a relatively thin pillar that is 9.5 ft wide at its thinnest section.rnThe relatively weak Scales Formation and the thin pillar necessitated some changes by the contractor’srndesigner to the original design proposed by the owner’s engineer. The alternative design implemented shorterrnexcavation drifts and use of pre-tensioned rock bolts in the pillar and at selected locations in the existing accessrntunnel to minimize movements. The competent rock in the floor beneath the pillar played an important role inrnminimizing the deformation during construction. A comparison between predicted and observed responses forrnthe underground openings is also presented.
机译:讨论了在不损害现有MINOS大厅和MINOS通道的完整性的情况下在费米实验室建造新的近探测器大厅(NDH)的设计方法。 NDH与现有通道之间的相对较薄的支柱是最薄部分,该支柱的最薄部分为9.5英尺宽。相对较弱的水垢形成和较薄的支柱使承包商的设计师必须对业主的工程师提出的原始设计进行一些更改。替代性设计实现了较短的开挖位移,并在立柱中和现有检修隧道的选定位置使用了预张紧的锚杆,以最大程度地减少移动。支柱下方地板中的主岩石在减小施工过程中的变形方面发挥了重要作用。还介绍了地下洞口的预测响应与观测响应之间的比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号