首页> 外文会议>North American tunneling 2014 proceedings >TBM Performance and Tool Wear Prediction Along Two Lots of Dyaaba Headrace Tunnel (Uma-Oya Project, Sri Lanka)
【24h】

TBM Performance and Tool Wear Prediction Along Two Lots of Dyaaba Headrace Tunnel (Uma-Oya Project, Sri Lanka)

机译:两条Dyaaba Headrace隧道的TBM性能和工具磨损预测(斯里兰卡Uma-Oya项目)

获取原文
获取原文并翻译 | 示例

摘要

Predicting TBM performance and cutter consumption in tunneling projects plays an importantrnrole on project schedule and cost. To predict these parameters, it is necessary to have reliable input parametersrnand suitable predictive models. In this paper, a new procedure used to anticipate TBMs performance parametersrnand cutter consumption along two lots of Dyaaba headrace tunnel (Uma-Oya project at Sri Lanka) have beenrnexplained. Applied empirical prediction models are simple equations and charts that use usual and easilyavailablernrock mass parameters as input data and can be applied simply. They are based on experiences gainedrnfrom actual TBM performance and disc cutters life measurements along similar tunneling projects.
机译:预测隧道工程中的TBM性能和刀具消耗对工程进度和成本具有重要的作用。为了预测这些参数,必须具有可靠的输入参数和合适的预测模型。在本文中,已经解释了一种新的程序,该程序可用于预测沿两条Dyaaba引水隧洞(斯里兰卡的Uma-Oya项目)的TBMs性能参数和刀具消耗。应用的经验预测模型是简单的方程式和图表,它们使用常规且容易获得的岩体参数作为输入数据,并且可以简单地应用。它们是基于在类似隧道项目中从实际TBM性能和圆盘切割机寿命测量中获得的经验得出的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号