DESIGN/BUILD FOR THE STEE FABRICATOR/ERECTOR

机译:钢制制造商/建造商的设计/建造

获取原文
获取原文并翻译 | 示例

摘要

Design/Build was once thought of as a "flavor-of-the-month" phenomenon, but instead has grown until today it represents nearly 50 percent of all non-residential construction procurement, especially in large or complex commercial and institutional projects. In all types of construction contract, someone takes on risk, and someone has control, and different types of construction contract shift this risk and control between Owner and Contractor. However, an underlying precept is that he who takes on the risk must also assume control, and Design/Build permits the steel fabricator/erector to take on risk while still retaining control. The steel fabricator/erector entering the Design/Build arena must ensure that he talks the same language as the Design/Builder, a fundamental part of which must involve being able to think conceptually, and to think beyond just the structural steel or even the entire structural frame. This may require the fabricator to acquire new skills and the software to go with them. In addition, the fabricator/erector must be able to assess how his risk changes in Design/Build, how those risks can be quantified, and then how to include those quantified risks in his bid or proposal. An example is included in assessing the increased risk, in actual dollars, compared with a traditional lump sum contract. This paper also includes various strategies in risk management, as well as supply chain management, all of which involves assessing how the process of design and construction changes in Design/Build, and then setting down the parameters for combining the inherent risk and control in a Design/Build contract in a way that ensures that all players are aware of the expectations and goals to be achieved while reaping the rewards. Finally, some discussion is included on the concept of Partnering―what it is and how it can be used in a Design/Build contract to improve the overall outcome for everyone, whether owner, Design/Builder or steel fabricator/erector.
机译:设计/建造曾经被认为是“月度风云”的现象,但是直到今天,它已经发展到占所有非住宅建筑采购的近50%,特别是在大型或复杂的商业和机构项目中。在所有类型的建筑合同中,都有风险承担,有控制权,不同类型的建筑合同在所有者和承包商之间转移了这种风险和控制权。但是,一个基本的原则是,承担风险的人也必须承担控制权,而“设计/建造”允许钢铁制造商/竖立者承担风险,同时仍保留控制权。进入设计/建造舞台的钢铁制造商/安装工必须确保他说的语言与设计/建造者相同,其中的基本部分必须包括能够进行概念性思考,并且不仅可以对结构钢甚至是整个结构进行思考。结构框架。这可能需要制造商掌握新技能,并附带软件。此外,制造商/装配商必须能够评估其风险在设计/建造中的变化方式,如何量化这些风险,然后如何将这些量化的风险纳入其投标书或提议中。与传统的一次性合同相比,评估增加的风险(以实际美元计)包括一个例子。本文还包括风险管理以及供应链管理中的各种策略,所有这些策略都涉及评估设计和施工过程在设计/构建过程中如何发生变化,然后设置参数以将固有风险和控制相结合。设计/建造合同的方式可以确保所有参与者都在收获奖励的同时意识到要实现的期望和目标。最后,讨论了关于伙伴关系的概念,即伙伴关系的概念以及如何将其用于设计/建造合同中,以改善所有人(无论是所有者,设计/建造者还是钢结构制造商/建造者)的总体成果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号