Watson Way Project: Microtunneling Lessons Learned or Revisited?

机译:沃森之路项目:从微隧道学到的教训还是重访?

获取原文
获取原文并翻译 | 示例

摘要

Although neither large nor complex, the Watson Way microtunneling project provided some interesting challengesrnduring construction. As usual, some challenges were related to site and geotechnical conditions, while otherrnchallenges were related to the construction contractor’s preference on how to build the project.rnThe project involved the installation of about 3,100-feet of 8 to 24-inch diameter sewer pipeline, mostly using slurryrnmicrotunneling methods, but also reaches of horizontal directional drilling (HDD) and cut-and-cover pipeline. Groundrnconditions were generally favorable, with low groundwater head. As designed, a series of launch and receiving pitsrnwere included to limit the microtunnel drive lengths to about 400 to 600-feet. However, the construction contractorrnproposed a variety of modifications to the design, including reducing the number of launch/receiving pits, extendingrnthe tunnel drives, substituting a pipe ram for the HDD drive, auger boring one planned microtunnel reach, andrnincreasing the amount of cut-and-cover construction.rnAn interesting issue that arose was related to the heat of hydration of the annular grout around the PVC carrier pipe,rnand carrier pipe damage due to grout injection pressure. This paper summarizes the field conditions encountered,rncontractor proposed changes, and construction challenges that were overcome to successfully complete the project.rnThe paper also describes the results of full scale mock up tests to evaluate the heat of hydration within the annularrnspace.
机译:尽管既不大也不复杂,但Watson Way微隧道项目在施工过程中提出了一些有趣的挑战。与往常一样,一些挑战与工地和岩土条件有关,而其他挑战则与建筑承包商对如何建设该项目的偏好有关。该项目涉及安装约3,100英尺的8至24英寸直径的下水道。使用泥浆微隧道法,还可以进行水平定向钻探(HDD)和切开覆盖管道。地下水条件总体良好,地下水位低。按照设计,包括一系列发射和接收坑,以将微隧道驱动器的长度限制为大约400到600英尺。但是,施工承包商对设计进行了各种修改,包括减少发射/接收坑的数量,延长隧道驱动器,用管道夯代替HDD驱动器,给钻头钻探一个计划的微隧道距离以及增加挖方和挖方的数量。出现了一个有趣的问题,与PVC输送管周围的环形灌浆的水化热有关,并且由于灌浆压力导致输送管损坏。本文总结了成功完成该项目所遇到的现场条件,承包商提议的变更以及克服的施工难题。本文还介绍了用于模拟评估环形空间内水化热的全面模拟试验的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号