The North Highway Connector (NHC) project consists of an expressway ring road around the East side Red Deer, arntraffic bridge and major underground deep utilities that combine the City of Red Deer and South Red Deer RegionalrnWastewater Commission (SRDRWC) wastewater transmission mains into a triple barrel river crossing siphonrnsystem. This report describes the triple barrel horizontally directionally drilled (HDD) River crossing aspect of thernNHC Contract A4 project.rnAs this was a multi-phased project, site conditions were changing continuously during the design period. The designrnteam needed to be aware of the changing site conditions and as such, needed to be in constant contact with all otherrnteams involved to insure design details represented the current conditions.rnThe Owners were concerned about the risk associated with the HDD River crossing construction and the risk wasrnmitigated by involving all stakeholders for the project (Contractor, Consultant and both Owners - City of Red Deerrnand the SRDRWC) by developing a comprehensive risk analysis whereby all risk occurrences, probabilities andrnresponsibilities were investigated and costs quantified. This was also supplemented by turbidity tests for the RedrnDeer River during construction. Other challenges for the HDD river crossing included a two stage tender process,rncasing installation and the on-site disposal of drilling mud.rnIn conclusion, the detailed efforts by all parties involved during this contract produced a project that came in underrnbudget and met deadline targets along with showcasing unique aspects of risk mitigation processes that can be usedrnas an example for similar projects in the future.
机译:北部公路连接器(NHC)项目由围绕东边红鹿,高速公路桥和主要地下深层公用事业的高速公路环线组成,将红鹿市和南红鹿区域水资源废水(SRDRWC)废水输送干线合并为三层桶河穿越虹吸系统。本报告描述了rnNHC合同A4项目的三桶水平定向钻探(HDD)河流过境方面。由于这是一个多阶段项目,因此在设计期间工地条件不断变化。设计团队需要了解不断变化的工地条件,因此需要与所有其他相关团队保持不断联系,以确保设计细节能够代表当前状况。业主担心与HDD河道穿越施工和施工相关的风险。通过开展全面的风险分析,对项目的所有利益相关者(承包商,顾问和业主双方-Red Deerrn市和SRDRWC)进行了全面的风险分析,从而对所有风险发生,概率和责任进行了调查,并对成本进行了量化。在施工过程中,还对RedrnDeer河进行了浊度测试。 HDD河流穿越面临的其他挑战包括两个阶段的招标流程,套管安装和钻井泥浆的现场处置。总之,总的来说,在合同中各方的努力都产生了一个预算不足并达到了最终目标的项目展示了风险缓解过程的独特方面,这些方面可以用作将来类似项目的示例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号