This paper outlines the description of a dynamic barrier installed between a railroad trench under construction and an existing toxic plume floating on the surface of ground water adjacent to an oil recycling facility. The Alameda Corridor Transportation Authority (ACTA), in April, 2002 completed construction of a 32km railroad transportation project which ranks as one of the largest freight transportation projects ever undertaken and one of national significance. The project includes 16km of surface tracks and a 16km below-surface Trench section along Alameda Street. The Trench portion will carry two railroad tracks beneath existing streets. During Trench construction, significant quantities of toxic waste were encountered in soil and ground water from adjacent facilities. This paper describes one such encounter and the solution chosen to avoid costly construction delays while providing for environmental safeguards.
机译:本文概述了在施工中的铁路沟渠和漂浮在毗邻石油回收设施的地下水表面上的现有有毒羽流之间安装的动态屏障的说明。阿拉米达走廊运输管理局(ACTA)于2002年4月完成了32公里铁路运输项目的建设,该项目被誉为有史以来最大的货运项目之一,具有国家意义。该项目包括沿着阿拉米达街的16公里的地面轨道和16公里的地下海沟部分。 Trench部分将在现有街道下方承载两条铁轨。在风沟建设期间,邻近设施的土壤和地下水中遇到了大量有毒废物。本文介绍了这样的一次遭遇以及为避免环境建设中的昂贵延误而提供环境保护措施的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号