首页> 外文会议>Ninth Beam Instrumentation Workshop, 9th, May 8-11, 2000, Cambridge, Massachusetts >RHIC Beam Loss Monitor System Commissioning in RHIC Year 0 Run
【24h】

RHIC Beam Loss Monitor System Commissioning in RHIC Year 0 Run

机译:RHIC 0年运行中的RHIC光束损失监测系统调试

获取原文
获取原文并翻译 | 示例

摘要

The RHIC Loss Monitor System (BLM) was successfully commissioned during the RHIC (Relativistic Heavy Ion Collider) Year 0 Run (summer of 1999). The system consists of 363 argon ionization detectors distributed around the ring. The signals are digitized in a distributed multiplexed ADC system and displayed at a 1 Hz rate in the control room. During the commissioning, the beam loss monitor system was extensively used for first turn beam steering. An impressive example of the capabilities of this system was the ability to locate a thin obstruction to within one magnet length, even though this obstruction transmitted most of the beam. With this information we were able to achieve circulating beam. This paper will discuss the RHIC beam loss monitor system design and testing. The data acquired during the RHIC commissioning run will also be presented.
机译:RHIC损耗监测系统(BLM)在RHIC(相对论重离子对撞机)第0年运行(1999年夏季)期间成功调试。该系统由分布在环周围的363个氩离子检测器组成。信号在分布式多路复用ADC系统中数字化,并在控制室中以1 Hz的速率显示。在调试期间,光束损失监测系统被广泛用于首次转向光束转向。该系统功能的一个令人印象深刻的示例是能够将细小的障碍物定位在一个磁体长度内的功能,即使该障碍物透射了大部分光束。有了这些信息,我们就可以实现循环光束。本文将讨论RHIC光束损失监测系统的设计和测试。还将显示RHIC调试运行期间获取的数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号