首页> 外文会议>Nickel and Cobalt 2005-Challenges in Extraction and Production >Process improvements at Falconbridge Dominicana
【24h】

Process improvements at Falconbridge Dominicana

机译:Falconbridge Dominicana的工艺改进

获取原文
获取原文并翻译 | 示例

摘要

Falconbridge Dominicana (Falcondo) has operated an integrated tpy nickel laterite mine and ferro-nickel processing plant since 1972 in the Dominican Republic. The operation includes mining, a processing plant, an oil refinery, and a power plant. Falcondo has improved process efficiency over the years via modernisation and better understanding of the process. The present business environment of high fuel prices and high nickel prices present a challenge and an opportunity to Falcondo's operation. This paper gives an update of Falcondo's process, improvements in energy consumption, factors affecting energy consumption and how Falcondo is facing up to the current business environment.
机译:Falconbridge Dominicana(Falcondo)自1972年以来在多米尼加共和国经营着一座一体化的Tpy镍红土矿和铁镍加工厂。该业务包括采矿,加工厂,炼油厂和发电厂。多年来,Falcondo通过现代化和对过程的更好理解提高了过程效率。当前高油价和高镍价的商业环境给Falcondo的运营带来了挑战和机遇。本文提供了Falcondo流程的更新,能耗的改进,影响能耗的因素以及Falcondo如何面对当前的商业环境。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号