Context: Re-planning of product releases is a very dynamic endeavor and new research methods or improvements of existing methods are still required. This paper explores the role of re-estimation in the re-planning process of product releases. Objective: The purpose of this study is to analyze effects of defect and effort re-estimation in the process of release re-planning. In particular, two questions are answered: Question 1: In the absence of re-estimation, does conducting re-planning have any advantages over not conducting re-planning? Question 2: In the case of re-planning, does conducting re-estimation have any advantages over not conducting re-estimation? Method: The proposed method H2W-Pred extends the existing H2W re-planning method by accommodating dynamic updates on defect and effort estimates whenever re-planning takes place. Based on the updates, effort for development of new functionality needs to be re-adjusted and balanced against the additional effort necessary to ensure quality early. The proposed approach is illustrated by case examples with simulated data. Results: The simulation results show that conducting re-planning yields better release value in terms of functionality than not conducting re-planning. Furthermore, performing re-estimation when doing re-planning generates a portfolio of solutions that help balance trade-offs between several aspects of release value, e.g., between functionality and quality. Conclusion: If the development of a product release requires balancing between potentially conflictive aspects, such as quality vs. functionality, then re-estimation in the re-planning process is beneficial.
机译:背景:产品发布的重新计划是一项非常动态的工作,仍然需要新的研究方法或对现有方法的改进。本文探讨了重新估算在产品发布的重新计划过程中的作用。目的:本研究的目的是分析在重新计划发布过程中缺陷和工作量重新评估的影响。尤其要回答两个问题:问题1:在没有重新估算的情况下,进行重新计划是否比不进行重新计划有任何优势?问题2:在进行重新计划的情况下,与不进行重新评估相比,进行重新评估是否具有任何优势?方法:所提出的方法H2W-Pred通过在每次进行重新计划时对缺陷和工作量估计进行动态更新来扩展现有的H2W重新计划方法。根据这些更新,需要重新调整开发新功能的工作量,并与确保早期质量所需的额外工作量进行平衡。通过带有模拟数据的案例示例说明了所提出的方法。结果:仿真结果表明,与不进行重新计划相比,进行重新计划在功能方面产生了更好的发行价值。此外,在进行重新计划时执行重新估计会生成一系列解决方案,有助于平衡发行价值的多个方面之间的权衡,例如功能和质量之间的权衡。结论:如果产品发行版的开发需要在潜在冲突的方面(例如质量与功能)之间保持平衡,那么在重新计划过程中进行重新估计将是有益的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号