Removals of a Top Part of Cast-in-situ Concrete Piles Utilizing Simplicity Charge Holder Blast System

机译:利用简易装药架爆破系统拆除现浇混凝土桩的顶部

获取原文
获取原文并翻译 | 示例

摘要

Removing of a part of case-in-situ pile top and mechanical breakage of concrete structures poses a risk to the occupational safety of those involved in the operation and also to others in the vicinity, due mainly to the noise hazard. A dynamic breakage system utilizing simplicity charge holder and steel plate was suggested rapidly to remove a part of the pile top. The steel plate is used to form the smooth end of the concrete pile and reduce the damage in the remaining part Laboratory-scaled blast tests had been performed to investigate the effect of the angle of the diamond-shaped charge holder on the fracture plane formation. The suggested dynamic breakage system was applied to removing of the top of full scaled concrete piles. The laboratory scaled and full scaled experiments were modeled to analyze the fracture processes of the concrete pile by the charge holders using a dynamic fracture process analysis (DFPA) code. The influence of the notch angle, shot time lag and spacing of the diamond-shaped charge holder on the fracture patterns was investigated.
机译:移除部分现场桩顶和混凝土结构的机械破损主要是对噪声的危害,对从事该作业的人员以及附近人员的职业安全构成威胁。迅速提出了一种利用简易装料架和钢板的动态破损系统,以去除桩顶的一部分。钢板用于形成混凝土桩的光滑端部,并减少剩余部分的损坏。已进行了实验室规模的爆炸测试,以研究菱形装药座的角度对断裂面形成的影响。所建议的动态破损系统被应用于去除全尺寸混凝土桩的顶部。对实验室规模和全规模的实验进行建模,以使用动态断裂过程分析(DFPA)代码对装药持有人进行的混凝土桩的断裂过程进行分析。研究了缺口角,射弹时间滞后和菱形电荷保持器的间距对断裂模式的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号