The Hoan Bridge, Located in Milwaukee Wisconsin failed on December 13, 2000. The bridge is approximately two miles long and has and ADT of about 32,000. It is a major interstate artery in downtown Milwaukee. The bridge has three 12' lanes of traffic in each direction. Each set of lanes has a 10' and 12' shoulder. The bridge consists of three different girder geometry's. There is an arch span over the main harbor channel, three girder approach spans adjacent to the arch, and the lower approach spans are multi-girder. The bridge opened to traffic in 1978. The failure occurred in the three girder portion of the structure. There is approximately 1,800' of three girder span on each end of the arch span. Two of the three girders in the longest three girder span failed completely and the third girder had three significant cracks. The span could not be saved and had to be demolished. An extensive failure analysis was performed by a team of experts from Lichtenstein Engineers, Lehigh University, and Federal Highway Administration. Also contributing were Michigan Tech University with a weigh-in-motion study and Northwestern University with strain gauge studies. The failure occurred at a lower lateral connection plate and was determined to be a brittle fracture with no fatigue indications noted in the failure. It is an un-inspectable failure. The steel girders are fabricated from A36 web material and A588 flange material. The material properties of the existing material would meet current zone 3 non-fracture critical requirements. The failed spans on the Hoan Bridge are not fracture critical but were inspected as such by Wisconsin DOT. A temporary retrofit was performed on the adjacent three girder spans and the bridge was opened up to a single lane of traffic in each direction, 4 ton maximum load, in February 2001. The Hoan Bridge was completely rehabilitated and was placed back into full service in October 2001. Nondestructive testing was performed at approx, 2,500 locations for the temporary retrofit and for the permanent repair. Nondestructive methods utilized were visual, video taping, ultrasound, magnetic particle, acoustic emission, and strain gauges.
机译:位于威斯康星州密尔沃基的Hoan大桥于2000年12月13日倒塌。这座大桥长约2英里,ADT约为32,000。它是密尔沃基市区的主要州际动脉。这座桥在每个方向上都有3条12'车道。每组车道都有10'和12'的路肩。桥梁由三种不同的大梁几何组成。主港航道上有一个拱跨,邻近拱的三个大梁进近跨,下部进近跨为多梁。这座桥于1978年通车。该结构的三个梁部分发生了故障。拱跨度两端各有大约1,800'的三个大跨度。最长的三个大梁跨度中的三个大梁中的两个完全失效,第三个大梁出现三个明显的裂缝。跨度无法保存,必须拆除。利希滕斯坦工程师,利哈伊大学和联邦公路管理局的专家团队进行了广泛的故障分析。密歇根理工大学还进行了运动称重研究,西北大学进行了应变仪研究。失效发生在下部的横向连接板上,被确定为脆性断裂,没有疲劳迹象。这是无法检查的故障。钢梁由A36腹板材料和A588法兰材料制成。现有材料的材料特性将满足当前的3区非断裂关键要求。还剑桥的失效跨度不是关键的断裂,但已由威斯康星州DOT对其进行了检查。 2001年2月,对相邻的三个大梁跨度进行了临时翻新,并向每个方向的单车道通车,最大载重量为4吨。还还对还还桥进行了全面修复,并于2004年2月重新投入服务。 2001年10月。在大约2500个位置进行了无损检测,以进行临时翻新和永久性维修。使用的非破坏性方法是视觉,视频录像,超声,磁粉,声发射和应变仪。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号